Email us @
Info@NorthPeaceCom.ca
Serving BC AB SK NL YT
HOME
SERVICES
ABOUT US
PRODUCTS
CONTACT US
MORE
Click on any legislation as it matches up with our particular jobs on our JHA-JSA
Operator quallifications 14.34 (1) (2)
Cranes policies 14.5
Load rating 16.20 (1) (2) (3)
Start of shift Inspection 16.34 (1)
Inspection and repair 16.34 (3)
Competency of operator 16.4 (1) (a) (b) (d)
Obstructed view 16.42
Disconnect and lockout 19.10 (1),
Ground Fault 19.15 (1)
Isolation and lockout 19.16 (1)
High Voltage 19.24 (1)
Min Distance from high voltage lines 19.5
Flammable materials 19.7 (2)
Lock out 19.10
iIsolating devises 19.21
Training 32.2 (1)
Risk Assesment 4.13 (1)
Risk evacuation 4.13 (2) (3)
Emergency proced workers 4.14 (3)
instruction of workers 4.16,
Evacuation procedures 5.1
Emergency plan 5.97 (1) (2)
Risk Control 4.5
Ed & Training 4.51
Fall Protection Obligation 11.2 (1)
Fall Protection Obligation 11.2 (6)
Equipment Selection 11.4
Equipment Standards 11.5
Inspection and Maintenance 11.9
1st aid Atten. Qualif 3.15 (b) ©
1st aid Basic 3.16 (1) (a) (1.1)
1st aid Basic 3.16 (1) (b)
1st aid Basic 3.16 (4)
Communication 3.18 (1)
First aid records 3.19 (1)
Incident investigation report 3.4
Incidents investigated
Refusal of unsafe work 3.12 (1)
Procedure for refusal 3.12 (2) (3)
Gen.requirement3.5
Remedy & reporting 3.9
reporting unsafe cond. 3.10
Impairment alcohol, drug ect. 4.20 (1)
Slipping & tripping 4.39
Underground utility services 20.79 (1)
Removing hazards 20.80
Sloping & shoring 20.81
Entry & exit 20.87 (1) (2)
Guarding 20.88
Excavated materials 20.90
Procedures for evacuation 5.100 (1) (a) (b) (c) (d)
Info. On chemical agents 5.2 (a) (b) (d)
Exposure Limits 5.48
Monitoring hazardous Substance 5.53 (1) (2)
Respirators required 8.32 (a)
Types of control 5.55 (3)
Table of exposure
Ladder Inspections 13.3
Position & Stability 13.5 (2) (a)©
Position & Stability 13.5 (2) (b) (i)
Position & Stability 13.5 (a) (b)
Energized Equipment 10.12
Lockout required 10.3 (1)
Lockout procedures 10.4 (1) (4)
Checking locked out equip. 10.6
Removal of locks 10.8
Group lockout procedure 12.2*
Safe Guarding req 12.2
Rotating Hazards 12.16
Fixed Guards 12.5
Guard moving parts 16.28
Intentional Removal Guards 4.12
PPE 8.10 (2)
Noise Exposure 7.2 (a)
Noise Measurement 7.3 (1),
Hearing Protection warning signs 7.7 (2)
Measurment of noise 7.3 (4)
Hearing conservation and noise control 7.5 (b)
Hearing Protection warning signs 7.7 (1) ©
General PPE 8.19
Safety head gear 8.11 (1) (2) (a)
Safety Eye Wear 8.14 (1)
Face Protection 8.17 (2) (a)
Safety Foot wear 8.22 (1) (3) (a)
Instruction of PPE 8.7
Operation and Maint 16.3 (3)
Seat Belts 16.32
Seat belt use 16.33 (1)
start up inspection 16.34 (1)
Report of insp 16.34 (2) (3)
Unattended equip 16.36 (1)
Securing loads 16.37 (1)
Competancy 16.4 (1)
Exposure Limits 7.19 (1) (3) (4) (5)
Monitor Exposure 7.22,
Radiation Surveys 7.24
Rigging Definitions 15.2
Wire Rope criteria 15.25,
Hook rjection Criteria 15.29
Chain removal Criteria 15.48,
Chain Wear 15.49 (1)
Syn Web Sling Reject criteria 15.54
Rejection Criteria 15.56
Detaching loads 15.3
Sling Insp before use 15.31
Use of Rigging 15.4 (2)
WLL Slings 15.33
Hook Rejection Criteria 15.29
Component ID 15.5 (1)
Wire Rope Sling ID 15.42,
Chain Sling ID 15.46
Synth Web Sling ID 15.52
Below Hook Lift Device 15.59
Scaffold platforms 13.14
Fall protection 13.33 (1)
Scaffold safety 13.8 (a)
Responsibilities for Scaffolds 13.13
Heat Stress controls 7.3
Provision of water 7.31
Removal from heat exposure 7.32
Cold Stress controls 7.35
Treatment of cold stress 7.38
Identifying unsafe equipment 12.10
Authorized operators only 4.1
Insp and Maint of tools and machinery 4.9 (1)
Decanted products 5.10 (1)
Supplier MSDS 5.14 (1)
MSDS Availability 5.16
Worker training 5.7
Supplier Label 5.8 (1) (2) (3)
Haz ID Control 4.20.2 (1) (2)
Check worker 4.21 (2)
Reg check ins 4.21 (2) (4)
Training 4.22
Risk Assesment 4.28
Instruction of workers 4.30 (1) (3)
Consult physician 4.31 (3)